JAM IN AMPERA BRIDGE
A number of vehicles are stuck at jam when going to cross the Ampera Bridge in Palembang, Sumsel, Thursday (12/5). In order to reduce the heavier Ampera Bridge load at once decomposes congestion, the construction of the Musi IV alternative crossing bridge has started and targeted finished before the 2018 Asian Games organizer. ANTARA PHOTO/ Feny Selly/aww/16.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.