TRAIN PREPARATION WIDTH

  • 27th June 2016 GMT+7
TRAIN PREPARATION WIDTH
The officer checked the condition of the masinis cabin of a locomotive at Dipo Lokomotive Large Station Madiun, Jatim, Monday (27/6). Against 2016 wide mud flow, PT KAI Daop 7 Madiun continues to carry out preparations such as locomotive and train repairs to guarantee the safety of udics using railways. ANTARA PHOTO/Fekri Joseph/aww/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x1987
File size
719.21 KB
Created
27/06/2016 19:15 WIB
Photographer
Fikri Yusuf
Editor