ELECTRICAL NETWORK TERMINAL 3
Workers prepare electrical cable installed in electric jalu to the new 3 terminal in Soekarno Hatta International Airport area, Tangerang, Banten, Monday (25/7). The power cable that has a length of approximately 750 meters it is prepared to supply the existing electrical flow in the terminal 3. ANTARA PHOTO/Lucky R./aww/16.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.