PRODUCTION PLTA POSO 2

  • 16th August 2016 GMT+7
PRODUCTION PLTA POSO 2
The President Director of PT Poso Energy Achmad Kalla (left thirty) is jointed with the Tehnik Manager and Basri Djalil Supporter (left), the Manager of the Poso 2 Slamet Supardi (second left), Director of PT Poso Energy Alimuddin Sewang (left quarter) and the Head of the Poso 1 Tajudin PLTA Project (right) when reviewing the Poso 2 PLTA in Power House Area, Poso, Central Sulawesi, Monday (15/8). The Poso 2 PLTA with a power capacity of 3 X 65 MW or 195 MW with investment value reaches Rp3.5 trillion is a nation's work plant that is one of the power supply for the Central Sulawesi region, South Sulawesi and Palu. ANTARA PHOTO/Muhammad Adimaja/foc/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2000
File size
1.19 MB
Created
16/08/2016 10:10 WIB
Photographer
Muhammad Adimaja
Editor