PRODUCTION PLTA POSO 2

  • 16th August 2016 WIB
PRODUCTION PLTA POSO 2
Water Power Plant Area (PLTA) Poso Unit 2 visible from the height at Poso, Central Sulawesi, Monday (15/8). The Poso 2 PLTA with a power capacity of 3 X 65 MW or 195 MW with investment value reaches Rp3.5 trillion is a nation's work plant that is one of the power supply for the Central Sulawesi region, South Sulawesi and Palu. ANTARA PHOTO/Muhammad Adimaja/foc/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2850x1687
File size
1.3 MB
Created
16/08/2016 10:10 WIB
Photographer
Muhammad Adimaja
Editor