OPERATION NEW CONTAINER TERMINAL ONE (NPCT1)

  • 27th August 2016 WIB
OPERATION NEW CONTAINER TERMINAL ONE (NPCT1)
A number of vehicles in the gate of the New Priok Container Terminal One (NPCT1), Tanjung Priok, Jakarta, Saturday (27/8). NPCT1 has an area of approximately 32 hectares (only) and capacity of 1.5 million TEUs per year. At the end of 2016 targeted a total length of pier reaches 850 meters at and a depth of -14 meters LWS as well as projected serving ships with a capacity of 13 thousand 15 thousand TEUs with weight above 150 thousand DWT. ANTARA FOTO/Yudhi Mahatma/pd/16

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1601
File size
1.45 MB
Created
27/08/2016 18:35 WIB
Photographer
Yudhi Mahatma
Editor