POWER SUPPLY PLBC

  • 8th September 2016 GMT+7
POWER SUPPLY PLBC
Workers conduct measurement areas that will be installed piles in Axen area of the Blue Ceiling Project Cilacap (PLBC), in the Factory RU IV Lomanis, Cilacap, Central Java, Thursday (8/9). The PLBC implementation will absorb 3000 labors up to 2018 and is able to produce 92,000 barrels of gasoline per day with the equivalent quality of Firstx capturing 92 octane. ANTARA PHOTO/Idhad Zakaria/foc/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2000
File size
1.02 MB
Created
08/09/2016 19:30 WIB
Photographer
Idhad Zakaria
Editor