REPAIR EMBANKMENT BRIDGE AMBROL
The work of installing "bronjong" contains stones in the foot of the ambrol bridge flooded in Bandung, Tulungagung, East Java, Wednesday (19/10). The embankment repairs are damaged in the national road connecting bridge to the Fishery Port of Nusantara Prigi, Trenggalek, it is a poor weather controlled quarter that causes the Parit Raya River water discharge increases so that it interferes with the project activity. ANTARA PHOTO/Destyan Sujarwoko/kye/16
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.