PREPARE THE CONNECTION OF THE POWER GENERATION SHIP IN NTT
The officers work on the addition of the capacity of "busbar" or the meeting point / connection of the power transformer and other power equipment 1 and 2 in the Steam Power Plant (PLTU) Bolok Kupang, NTT, Thursday, (24/11). PT PLN the NTT region will conduct a simultaneous outage in three districts / cities for 10 hours on Saturday (26/11) from 07.00-17.00 WITA, for the prosecution of electrical installations for connections to power vessels that will be placed in Kupang. ANTARA PHOTO/Kornelis Kaha/aww/16.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.