ARRIVAL ELECTRIC BOAT

  • 19th December 2016 GMT+7
ARRIVAL ELECTRIC BOAT
"Marine Vessel Power Plant" power vessels arrive at the dock of the Steam Power Plant area (PLTU) in Bolok, Kupang,NTT, Monday (19/12). PT. Perusahan Negara (PLN) rented the Turkish electricity ship for five years to strengthen the electricity system in NTT especially for the island of Timor. ANTARA PHOTO/Kornelis Kaha/ama/16.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x2000
File size
1.47 MB
Created
19/12/2016 18:15 WIB
Photographer
Kornelis Kaha
Editor