BROKEN BRIDGE

  • 26th June 2009 GMT+7
BROKEN BRIDGE
LAMNO, ACEH, 26/6 - RUSAK WARRANTY. A number of scalable trucks of sembako loads and building materials are forced to cross the river and several units in which are trapped in water due to the baley bridge built by TNI post tsunami then damaged in Lamno Village, Aceh Jaya Regency, NAD, Thursday (26/6). The only crossing of the goods trucks from Banda Aceh to West Aceh has four days of salvation and worrying about the supply of statutory needs and other important items for citizens in the area are inspired. ANTARA/Ampelsa/Koz/hp/09.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2048x1333
File size
553.39 KB
Created
26/06/2009 12:18 WIB
Photographer
Ampelsa
Editor