RAW MATERIAL OF SAGO MANUFACTURING REDUCED

  • 9th March 2017 GMT+7
RAW MATERIAL OF SAGO MANUFACTURING REDUCED
A worker transports sago tree pieces into the car open before processed into flour in Teupin Bate Village, Idi Rayeuk District, East Aceh, Aceh, Thursday (9/3). The sago flour processing entrepreneur admitted, since the last year the sago flour demand has increased but the balance of raw materials is reduced so that the effort is threatened closed. ANTARA PHOTO/Syifa Yulinnas/ama/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x2000
File size
1.33 MB
Created
09/03/2017 19:50 WIB
Photographer
Syifa Yulinnas
Editor