RAILWAY LINE INSPECTION

  • 16th March 2017 GMT+7
RAILWAY LINE INSPECTION
PT Railway Indonesia’s officer of the VP Daop 9 checks the means and infrastructure of Railway Lines at Banyuwangi Baru Station, Banyuwangi, East Java, Thursday (16/3). The check to ensure the safety of the changes in the train schedule as well as as as the evaluation of the transportation of the Lebaran. ANTARA PHOTO/Budi Candra Setya/ama/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
5184x3456
File size
1.38 MB
Created
16/03/2017 22:05 WIB
Photographer
Budi Candra Setya
Editor