TOLL ROAD BAWEN-SALATIGA

  • 28th May 2017 GMT+7
TOLL ROAD BAWEN-SALATIGA
Tol Bawen-Salatiga street atmosphere looks from Tuntang, Semarang, Central Java, Sunday (28/5). PT Trans Marga Central Java ensures the Tol Bawen-Salatiga Road will soon be completed and ready to be passed on the 2017 Lebaran mud flow. ANTARA PHOTO/Hafidz Mubarak A/aww/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3992x2992
File size
2.74 MB
Created
28/05/2017 19:40 WIB
Photographer
Hafidz Mubarak A
Editor