PREPARATION OF MUDR FLOW

  • 5th June 2017 WIB
PREPARATION OF MUDR FLOW
Railway locomotive washing workers at Banyuwangi Station, Banyuwangi, East Java, Monday (5/6). A total of 80 train fleets prepared by PT Daop IX Jember’s railways have been declared ready to face the widest mud flow of 2017. ANTARA PHOTO/Budi Candra Setya/kye/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.07 MB
Created
05/06/2017 15:55 WIB
Photographer
Budi Candra Setya
Editor