BSI BEGAN GOLD PRODUCTION

  • 8th June 2017 WIB
BSI BEGAN GOLD PRODUCTION
President Director of PT Merdeka Cooper Gold Tbk Adi Adriansyah Sjoekri (second left) and Deputy Dirut Colin Francis Moorhead (left), talked together Director of Hardi Wijaya Liong (right three), Director Rony N Hendropriyono (second right) and Director Michael W Soeryadjaya, as the Annual General Meeting of Shareholders, in Jakarta, Thursday (8/6). Merdeka Cooper Gold, through his subsidiary as a mine operator, PT Bumi Suksesindo (PT BSI), in the I 2017 quarter has started the production of prime gold in the seven hill mine, Banyuwangi, East Java, which was done after the mining construction process was completed in the end of 2016. ANTARA PHOTO/Audy Alwi/foc/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2830x1776
File size
692.38 KB
Created
08/06/2017 19:30 WIB
Photographer
Audy Alwi
Editor