SOLAR PANEL TAPETTONADI TERMINAL

  • 26th July 2017 GMT+7
SOLAR PANEL TAPETTONADI TERMINAL
Under the installation of solar panels in Tirtonadi Terminal, Solo, Central Java, Wednesday (26/7). The Ministry of Transportation Project is able to generate 500 kilo volt ampere power (kVA) or 500.000 watts as an effort of operational energy savings A Tirtonadi type Terminal. ANTARA PHOTO/Mohammad Ayudha/foc/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3292x2095
File size
1.61 MB
Created
26/07/2017 14:45 WIB
Photographer
Mohammad Ayudha
Editor