INCREASE PE PRODUCTION TWICE

  • 31st August 2017 GMT+7
INCREASE PE PRODUCTION TWICE
President Director of PT Chandra Asri Petrochemical Tbk (CAP) Erwin Ciputra (second right) and Vice President Director Kulachet Dharachandra (right) combined with Director of Toyo Engineering Corporation Japan Tomohisa Abe (mid), President & CEO of Toyo Engineering Korea Limited Toru Osanai (second left), President Director of PT Inti Karya Persada Tehnik (IKPT) Eiji Hosoi (left) as the signing of a new EPC Plant Polyethylene (PE) Contract in Jakarta, Thursday (31/8). CAP targets a new PE Plant capacity of 400 KTA located in Cilegon, Banten, can start operating in 2020 as well as will increase the production of PE twice as early as 336 KTA to 736 KTA. ANTARA PHOTO/Audy Alwi/ama/17

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4025x2533
File size
1.67 MB
Created
31/08/2017 16:40 WIB
Photographer
Audy Alwi
Editor