NORMALIZATION OF CILIWUNG RIVER
The officer with heavy equipment dredging the mud deposit in the Ciliwung river in the Western Channel Flood area (BKB), Jakarta, Monday (4/9). The sludge lifting is carried out to prevent river sedimentation as well as to smooth river water flow. ANTARA PHOTO/Predipta/aww/17.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.