RAFIK LOADING BAYUR BAY

  • 14th September 2017 GMT+7
RAFIK LOADING BAYUR BAY
Reflection of harbor workers near the container casket piles at the Chest Terminal Kemas Bayside Terminal, Padang, West Sumatra, Thursday (14/9). PT Pelindo II Bayur recorded, the process of loading the container from the ship to exit the port (dwelling time) at that port this year for three days, with an average of 155 bytes per day, up 3 percent of the previous year 150 teus per day. ANTARA PHOTO/Iggoy el Fitra/Spt/17

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2742
File size
2.57 MB
Created
14/09/2017 20:15 WIB
Photographer
Iggoy El Fitra
Editor