PLTB SIDRAP CAPACITY 75 MW

  • 30th September 2017 WIB
PLTB SIDRAP CAPACITY 75 MW
Minister of Energy and Mineral Resources (ESDM), Ignasius Jonan (second left), Bupati Sidrap Rusdi Masse (left), along CEO and Chairman of UPC Renewables, Brian Caffyn (right) visited the location of wind turbine construction Ridge1 project of the Bayu Power Lister (PLTB) in Mattirotasi Village, Sidenreng Rappang (Sidrap), South Sulawesi, Saturday (30/9). Gradually UPC Renewables Indonesia will build as many as 30 wind turbines located at PLTB Sidrap with a total capacity of 75 Mega Watts of electrical power equivalent to 7 percent of the supply of South Sulawesi region, the PLTB Sidrap is the first wind-powered power generation project in Indonesia. ANTARA PHOTO/Dewi Fajriani/nz/17

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x6000
File size
3.31 MB
Created
30/09/2017 17:35 WIB
Photographer
Dewi Fajriani
Editor