CONSTRUCTION OF BARRO STADIUM

  • 5th October 2017 GMT+7
CONSTRUCTION OF BARRO STADIUM
A number of workers scratch the construction of the Barrian Stadium tribun, Makassar, South Sulawesi, Thursday (5/10). The stadium located in the Barra Beach area with a capacity of 40 thousand people and was built using the APBN and APBD fund of Rp202 billion was targeted to be completed in 2018. ANTARA PHOTO/Abriawan Abhe/kye/17

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2619
File size
2.55 MB
Created
05/10/2017 18:55 WIB
Photographer
Abriawan Abhe
Editor