CONSTRUCTION PLTB SIDRAP

  • 28th November 2017 WIB
CONSTRUCTION PLTB SIDRAP
Workers crossing in the development area of Bayu Power Listirk (PLTB) in Mattirotasi Village, Sidrap Regency, South Sulawesi, Tuesday (28/11). The construction of the PLTB with 75 megawatt capacity will help the supply of electricity in the Sulselbar Region and targeted the end of 2017 year with a round force of 30 windmill turbines. ANTARA PHOTO/Abriawan Abhe/foc/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2644
File size
2.38 MB
Created
28/11/2017 15:30 WIB
Photographer
Abriawan Abhe
Editor