HOLTEKAMP BRIDGE FRAME CONSTRUCTION

  • 29th November 2017 GMT+7
HOLTEKAMP BRIDGE FRAME CONSTRUCTION
The development and assembly of the Holtekamp Bridge arch steel frame in PT PAL, Niaga Ship Division in Surabaya, East Java, Wednesday (29/11). The Holtekamp Bridge arch steel frame with a length of 110 meters, the height of 20 meters and the weight of 2,000 tons it will be lifted by the Ministry of PUPR to Jayapura City, Papua Province on December 3rd. ANTARA PHOTO/Moch Asim/Spt/17.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2667x4000
File size
2.11 MB
Created
29/11/2017 19:50 WIB
Photographer
Moch Asim
Editor