NATIONAL SALT PRODUCTION
Farmers control the process of salt processing with tunnel methods (tunnel) and plastic membranes, in Lam Ujong Baitussalam Village, Aceh Besar, Aceh, Thursday (25/1). Aceh salt farmers begin to develop production systems with tunnel methods and plastic membranes to meet and the needs of national salts estimated at 3,98 million tons in 2018. ANTARA PHOTO/Irwansyah Putra/aww/18.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.