River Transportation

  • 29th September 2009 GMT+7
River Transportation
MUARA TEWEH, 29/9 - HAMBAT TRANSPORTATION SUNGAI. The officials of the Land Transportation Safety Director of the Ministry of Transportation and the Government of North Barito Regency, Central Kalimantan conducted a KH Hasan Basri Muara Teweh Bridge survey,Selasa (29/9). The 270-long steel-constructing bridge in the Barito River is assessed is not appropriate or able to be passed normally with the traffic density of the ship and the barge that crosses the bridge so it should be done the construction change (redesigned). ANTARA/Kasriadi/ed/mes/09.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3872x2592
File size
817.16 KB
Created
29/09/2009 16:25 WIB
Photographer
Kasriadi
Editor