PLTU SURALAYA LEVEL EFFICIENCY
Controlling workers check the terminal unit and coal distribution in Suralaya PLTU, Cilegon, Banten, Saturday (24/3). GM Indonesia Power UP Suralaya Amlan Nawir stated that the party is now implementing the ultrasound technology (Ultra Super Critical) in the middle generation system was built to increase efficiency of up to 40 percent than the technology installed before so that the electric selling price can be cheap. ANTARA PHOTO/Asep Fathulrahman/ama/18
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.