ELECTRIC POLE TUMBANG WIND LENGTH

  • 26th June 2018 GMT+7
ELECTRIC POLE TUMBANG WIND LENGTH
A number of vehicles crossing on the side of the electric pole in Babah Jurong Village, Kuta Baro District, Aceh Besar Regency, Aceh, Tuesday (26/6). Slightly 19 roboh electric poles after the wind length is tight so that causing the power supply is disconnected around the place. ANTARA PHOTO/Ampelsa/Spt/18

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3000x2053
File size
2.01 MB
Created
26/06/2018 15:35 WIB
Photographer
Ampelsa
Editor