CONSTRUCTION OF THE TERHENTI DUG BRIDGE
Farming is active with the background of the bridge that has not finished the development process, in the Mekar Beach area, Muara Gembong, Bekasi District, West Java, Monday (16/7). The construction of Bekasi’s connecting bridge and Karawang that transversely above the Citarum River was stopped due to the fee. ANTARA PHOTO/Risky Andrianto/aww/18.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.