OPERATION TARGET PORT GILI MAS

  • 19th September 2018 GMT+7
OPERATION TARGET PORT GILI MAS
A number of pier designs installed in the construction project location of Gili Mas Port in the District of Sheets, West Lombok, NTB, Wednesday (19/9). PT Pelindo III (Persero) Branch Sheet targets the development project at Gili Mas Port in West Lombok District is completed and can begin operating in May 2019, and later the Gili Mas port will have drafts - 14 MLWS (Mean Low Water Springs) so that it can hold the ships of the Rumpesiar and ships that have a length of more than 100 meters with container field capacity that Åmampu holds 200 thousand to 300 thousand containers. ANTARA PHOTO/Ahmad Subaidi/ama/18

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4048x2676
File size
3.85 MB
Created
19/09/2018 17:15 WIB
Photographer
Ahmad_subaidi
Editor