RAILWAY REPAIR

  • 20th September 2018 GMT+7
RAILWAY REPAIR
Workers fix the railroad path at KA Bago alignment point, Tulungagung, East Java, Thursday (20/9). The rail path improvement aims to balance the second geometry of the side of the rail body to increase the average speed of the passing railway rate, from before at the range 70-80 km per hour to 90 km per hour. ANTARA PHOTO/Destyan Sujarwoko/kye/18

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2655
File size
2.7 MB
Created
20/09/2018 16:30 WIB
Photographer
Destyan Sujarwoko
Editor