CONSTRUCTION NEW PORT

  • 23rd October 2018 WIB
CONSTRUCTION NEW PORT
A heavy equipment vehicle operates in the development area of Makassar New Port project, Makassar, South Sulawesi, Tuesday (23/10/2018). The Makassar New Port project will produce dermaga along 320 meters as well as an area of 16 hectares of container has reached the development progress of 86 percent and targeted began to be operated at the end of October 2018 with the use of "container crane" tools and "rubber tyred gantry". ANTARA PHOTO/Abriawan Abhe/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2659
File size
2.03 MB
Created
23/10/2018 16:45 WIB
Photographer
Abriawan Abhe
Editor
Andika Wahyu