CLUSTER ELECTRICITY RECOVER POSTGEMPA
The air photo of the lightning atmosphere with the light of the city of Mataram, NTB, Friday (26/10/2018). According to the data PLN territory of NTB the terrible conditions of Lombok system has recovered the postgempa where the peak load in Lombok has reached 224 MW, similar to the earthquake, and the power is able to the current Lombok electricity system reaches 251 MW. ANTARA PHOTO/Ahmad Subaidi/ama.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.