PLTN DEVELOPMENT PLAN

  • 16th November 2018 WIB
PLTN DEVELOPMENT PLAN
Head of National Nuclear Power Agency (BATAN) Djarot Sulistio Wisnubroto (second left) accompanied by Deputy of Solarntoro Nucler Energy Technology (left) listening to the explanation of the Head of Physics Technology Reaktor Syaiful Bakhri (right) regarding the work of Accoustic Emission tools or nuclear equipment detection monitoring tools through sounds in Puspiptek Serpong Area, South Tangerang, Banten, Friday (16/10/2018). The government through BATAN in the near future will build the Experimental Power Reactor (RDE) to produce Nuclear Power Plant (PLTN) which capacity 10MWt or equivalent to 3Mwe, in addition to producing PLTN, this Reactor can later convert saltwater to freshwater that will be built in Puspiptek Serpong. ANTARA PHOTO/Muhammad Iqbal/hp.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2562
File size
2.68 MB
Created
16/11/2018 17:30 WIB
Photographer
Muhammad Iqbal
Editor
Hermanus Prihatna