TRIAL TERMINAL PACKING BOX

  • 27th November 2018 WIB
TRIAL TERMINAL PACKING BOX
PT Pelindo I checked the process of typing transfer activity to load to the dock, at the premier operation trial of Kuala Tanjung Multipurpose Terminal (KTMT) in Batu Bara, North Sumatra, Tuesday (27/11/2018). The development of the stage I Port Kuala Tanjung is the construction of a 600 thousand TEUs multipurpose terminal has entered the final preparation and has obtained the operation permit of the Multipurpose Dermaga from the Marine Transportation Director and the Head of Complaints and Port Authority (KSOP) Kuala Tanjung. ANTARA PHOTO/Irsan Mulyadi/hp.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
5472x3648
File size
3.24 MB
Created
27/11/2018 15:30 WIB
Photographer
Irsan Mulyadi
Editor
Hermanus Prihatna