INSTALLATION OF WASTE WATER TREATMENT BATIK

  • 28th November 2018 GMT+7
INSTALLATION OF WASTE WATER TREATMENT BATIK
The officer checked the content of batik waste water in the Installation of Waste Water Treatment (IPAL) in the village of Batik, Pekalongan, Central Java, Wednesday (28/11/2018). The IPAL uses a biological system that uses micro organisms or waste determination bacteria is able to process batik waste water up to two tons in a day with waste water drop rate to approximately 80-90 percent. ANTARA PHOTO/Harviyan Prime Putra/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2528
File size
2.67 MB
Created
28/11/2018 17:45 WIB
Photographer
Harviyan Perdana Putra
Editor
Andika Wahyu