OPERATION OF CYLINDRICAL PORT CRANE

  • 3rd December 2018 GMT+7
OPERATION OF CYLINDRICAL PORT CRANE
GM PT Pelindo I Branch Sibolga Agust Deritanto (left) combined with Head Office Complaints and Port Authority (KSOP) Sibolga Augustia Waruwu (right) on the operation of the dock crane in the port, in Sibolga, North Sumatra, Monday (3/12/2018). The operation of the dock crane or "fix crane" is expected to further increase the productivity of loading unloading current in the port. ANTARA PHOTO/Irsan Mulyadi/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4896x3264
File size
1.29 MB
Created
03/12/2018 11:45 WIB
Photographer
Irsan Mulyadi
Editor
Andika Wahyu