CONSTRUCTION TOL DRILLER SEXY III A

  • 24th December 2018 GMT+7
CONSTRUCTION TOL DRILLER SEXY III A
A number of motor vehicles cross the road tol layang Bogor Outer Ring Road (BORR) Sholeh Iskandar, Bogor City, West Java, Monday (24/12/2018). The Toll BORR Hot III A ruas Simpang Yasmin to Semplak Bogor with 2,85 km long is targeted completed in November 2019 through the budget of APBN at Rp3 trillion. ANTARA PHOTO/Yulius Satria Wijaya/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2672
File size
1.37 MB
Created
24/12/2018 16:15 WIB
Photographer
Yulius Satria Wijaya
Editor
Fanny Octavianus