IV BRIDGE OPERATION TRIAL
A number of vehicles across the Musi IV Bridge during the bridge’s operational trial in Palembang, South Sumatra, Thursday (3/1/2019). The operational trial was conducted since Thursday (3/01/2019) until the results of the operational trial evaluation came out. ANTARA PHOTO/Nova Wahyudi/foc.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.