PLTN DEVELOPMENT PLAN

  • 28th January 2019 GMT+7
PLTN DEVELOPMENT PLAN
Head of Laboatorium Safety Regulator Nuclear National Nuclear Power Agency (BATAN) Deswandri explained the Helium filtering machine that became part of the Experimental Power Reactor (RDE) to the media in the Nuclear Power Generation Lab (PLTN) in Puspiptek Serpong Area, South Tangerang, Banten, Monday (28/1/2019). The government through BATAN in the near future will build the Experimental Power Reactor (RDE) to generate the Nuclear Power Generation (PLTN) that capacity 10MWt or equivalent to 3Mwe. In addition to producing PLTN, this reactor can turn salty sea water into fresh water that will be built in the Serpong Puspiptek area. ANTARA PHOTO/Muhammad Iqbal/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2717
File size
2.29 MB
Created
28/01/2019 16:00 WIB
Photographer
Muhammad Iqbal
Editor
Andika Wahyu