CONSTRUCTION PLTA ROD TORU

  • 30th January 2019 GMT+7
CONSTRUCTION PLTA ROD TORU
Senior Advisor Environmental PT North Sumatra Hydro Energy (NSHE) Agus Djoko Ismanto Adji (left) combined with the Forest Ecosystem Controller of Young Experts BBKSDA Sumut Fitri Noor (second left), Expert Power for Bendungan Design, Forging and Tunnel PT NSHE Didiek Djarwadi (second right) and Wimar Witoelar moderator (right) in the media Briefing "PLTA Rod Toru Safe and Environmental Friendly" in Medan, North Sumatra, Wednesday (30/1/2019). The activity discusses the development of the Water Power Plant (PLTA) Toru Rod in South Tapanuli which is a national strategic project by keeping maintaining the natural conservation of the Toru River and surroundings. ANTARA PHOTO/Irsan Mulyadi/wsj.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
3500x2333
File size
1.65 MB
Created
30/01/2019 18:05 WIB
Photographer
Irsan Mulyadi
Editor
Widodo S Jusuf