TARGET IS NOT ACHIEVED
BOGOR, 22/12 - TARGET NOT EXPRESS. A man crosses besides a rock containing gold at the mining location of PT Aneka Tambang (Antam) UBP Gold Pongkor, Nanggung, Bogor, Jabar, Monday (21/12). Target gold production PT Antam UBP Gold Pongkor in 2009 as many as 2800 kg while reached until now as much as 2500 kg. ANTARA/Jafkhairi/Koz/hp/09.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.