REPAIR ELECTRICAL TISSUE POSTSLIDE LANDSLIDE
PLN officers carry out electrical poles to be installed in Pattalikang Village, Manuju District, Gowa Regency, South Sulawesi, Friday (1/2/2019). The landslide of the landslide in Gowa makes the electrical network disconnected, and is now in repair. ANTARA PHOTO/Abriawan Abhe/ama.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.