IV SIAK BRIDGE LOAD TEST
The Ministry of Public Works along the team of Bridge Security Commissions and Road Tunnels (KKJTJ) conducts a load test or load test by compiling 24 units of sand-filled truck car in the Siak Bridge IV Pekanbaru, Riau, Friday (8/2/2019). This load test is carried out to prove that the security level of the structure parts has met the requirements of existing building regulations before the bridge was officially operated. ANTARA PHOTO/Rony Muharrman/pd.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.