ELECTRICAL DISTRIBUTION MATURE

  • 29th December 2009 WIB
ELECTRICAL DISTRIBUTION MATURE
SURABAYA, 29/12 - DISTRIBUTION LISTRIK MADURA. A number of workers conducting the connection of the High Voltage Air Line (SUTET) cable in Tanjung Perak Surabaya, Tuesday (29/12). This network will be passed Suramadu bridge for electricity distribution from Java to Madura that was previously passed the underwater cable. ANTARA/Bhakti Pundhowo/EI/ed/nz/09

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2048x1173
File size
190.57 KB
Created
29/12/2009 15:21 WIB
Photographer
Bhakti Pundhowo
Editor