ROAD CONSTRUCTION

  • 25th February 2019 GMT+7
ROAD CONSTRUCTION
The atmosphere of the Bojong Gede-Kemang road development project (Bomang) that was assembled at Tajur Halang, Bogor Regency, West Java, Monday (25/2/2019). Stop the development of the road that connects the Parung Highway with the Cibinong East Java Road and is financed from the Special Allocation Fund (DAK) of Rp67,9 billion since 2018 it was controlled by 17,000 square meters of the land belonging to the undisclaimed community. ANTARA PHOTO/Yulius Satria Wijaya/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2672
File size
1.21 MB
Created
25/02/2019 12:30 WIB
Photographer
Yulius Satria Wijaya
Editor
Audy Mirza Alwi