PRESS FLOOD JAKARTA
JAKARTA, 15/1 - VOLTAGE OF JAKARTA. Two heavy equipment digging most of the land that is still in the East Flood Canal (KBT) line that has been translucent to the sea in Marunda, Cilincing, North Jakarta, Friday (15/1). The Great Hall of the Ciliwung Cisadane River ensures the functioning of the KBT later, the potential of floods due to rainfall from outside the city can be pressed, given that channel has a capacity of water tamps as much as 390 m3 per second. ANTARA/Widodo S. Jusuf/ed/ama/10.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.