POWER INDONESIA

  • 14th March 2019 GMT+7
POWER INDONESIA
Tanjung Power Indonesia PLTU air photo in Tanjung, Tabalong, South Kalimantan, Wednesday (13/3/2019). The 2x100 MW capacity is built by PT Tanjung Power Indonesia consortium PT Adaro Power (65 percent) and PT East West Power (35 percent) using CBF technology so it can reduce NOx emissions and targeted from operating in semester 1 year 2019. ANTARA PHOTO/Hafidz Mubarak A/pras.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2666
File size
2.43 MB
Created
14/03/2019 00:35 WIB
Photographer
Hafidz Mubarak A
Editor
Prasetyo Utomo