MRT READY TO OPERATE

  • 22 Maret 2019 19:35 WIB
MRT READY TO OPERATE
Passenger antre for the Integrated Moda Raya public trial (MRT) Jakarta, Friday (22/3/2019). Moda Raya Integrated (MRT) has prepared two types of service cards namely "single trip" with Rp15,000 rates, "multi trip" for Rp25,000 and will operate on March 25, 2019. ANTARA PHOTO / Early Lingga/nz

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3412x2274
File size
1.59 MB
Created
22/03/2019 19:35 WIB
Photographer
Rivan Awal Lingga
Editor
Zarqoni Maksum