ELECTRIC MV

  • 26th January 2010 WIB
ELECTRIC MV
BANGKALAN, 26/1 - ELECTRIC 200 MV. A number of workers conduct electrical wiring installation at the end of the Madura side Suramadu bridge, Tuesday (26/1). The electrical cable to add electricity supply to the Madura Island of 200 MV. As a result of the workmanship, the motor driver is switched to the four wheel path. PHOTO ANTARA/Eric Ireng/ss/mes/10

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
1632x2464
File size
717.14 KB
Created
26/01/2010 18:25 WIB
Photographer
Eric Ireng
Editor